Close Menu
  • Entertainment
    • Celebrities
    • Music
    • Television & Movies
  • Healthcare
    • Fitness
    • Health
    • Wellbeing
  • Lifestyle
    • Culture
    • Love
    • Trending
  • Living
    • Homes
    • Nice house
  • Style & Beauty
    • Accessories
    • Beauty
    • Fashion
  • Travel
    • Activities
    • Food
    • Places & Attractions
    • Weekend escapes
Facebook X (Twitter) Instagram
Tuesday, February 3
  • Homepage
  • Sitemap
Facebook X (Twitter) LinkedIn VKontakte
Healthcare, Lifestyle, Entertainment, Living and TravelHealthcare, Lifestyle, Entertainment, Living and Travel
  • Entertainment
    • Celebrities
    • Music
    • Television & Movies
  • Healthcare
    • Fitness
    • Health
    • Wellbeing
  • Lifestyle
    • Culture
    • Love
    • Trending
  • Living
    • Homes
    • Nice house
  • Style & Beauty
    • Accessories
    • Beauty
    • Fashion
  • Travel
    • Activities
    • Food
    • Places & Attractions
    • Weekend escapes
Healthcare, Lifestyle, Entertainment, Living and TravelHealthcare, Lifestyle, Entertainment, Living and Travel
Home»Lifestyle»Legal setbacks against a dam in the Amazon raise questions about Brazil’s reliance on hydropower
Lifestyle

Legal setbacks against a dam in the Amazon raise questions about Brazil’s reliance on hydropower

01/29/20267 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email


SAO PAULO (AP) — The Belo Monte hydropower plant in the Brazilian Amazon, one of the world’s largest, was designed…

SAO PAULO (AP) — The Belo Monte hydropower plant in the Brazilian Amazon, one of the world’s largest, was designed to channel water from the Xingu River in a way that would avoid the need for large reservoirs, which could flood surrounding areas.

After years of legal battles, authorities approved the project, located in the southwestern part of the state of Para, on one condition: it would not threaten ecosystems and communities of Indigenous people along stretches of the river.

A decade after operations began in 2016, Brazilian courts have found that Belo Monte failed to meet that requirement and that its environmental and social impacts were far greater than forecast.

“They were just confirming what we already knew,” said Ana Laíde Barbosa, a member of Movimento Xingu Vivo, an advocacy group that has been fighting the Belo Monte project since 2008.

The courts’ understanding, she said, did not happen by chance: “There was research, experience. There was ancestry and inherited knowledge.”

The legal setbacks raise broader questions about Brazil’s reliance on hydropower, with several dams supplying most of the nation’s electricity. Belo Monte, the second largest, was originally planned during the military dictatorship in the 1970s but wasn’t pushed forward until decades later by President Luiz Inácio Lula da Silva in 2010, during his second term. Today, it supplies about 10% of Brazil’s electricity.

In December, the Supreme Court ordered the federal government to pay 19 million reais ($3.6 million) in compensation to Indigenous communities affected by the dam.

Separately, a local court ordered Norte Energia, the company that built and operates Belo Monte, to supply clean water to communities whose natural sources dried up, leaving them dependent on bottled water.

In the most consequential ruling, a federal judge ordered Norte Energia to reassess how much water it diverts from the Xingu River to run its turbines, a move the company says could reduce power output.

Norte Energia said the ruling ordering a review of water management would have no immediate effect, noting that any changes could occur only after all appeals are exhausted. It also said its current model balances environmental concerns with energy security and consumer costs. The company has begun supplying water to families in the Xingu region, delivering 20‑liter jugs every 15 days, according to local leaders, though not all households have been registered.

New legislation will fast-track projects like Belo Monte

Belo Monte was built amid protests and a licensing process that faced many legal challenges. In 2012, construction was temporarily halted after a court ruled that potentially impacted communities had not been properly consulted. Norte Energia denied the damages and said the dam did not displace or flood Indigenous communities.

Starting in February, new legislation passed by Congress last year will fast-track approval of strategic infrastructure projects. Analysts say impacts from large projects like Belo Monte could become more common.

Licensing processes that until now took six or seven years and required three separate permits will now be completed within 12 months. “That clearly means less rigorous scrutiny of social and environmental impacts,” said Suely Araújo, a policy coordinator at the Climate Observatory, a network of environmental nonprofits.

Natalie Unterstell, president of Talanoa, a Brazilian climate think tank, said Belo Monte illustrates how impacts such as altered river flows — including those intensified by climate change — are often underestimated.

“Belo Monte is a reminder that climate leadership is not just about curbing deforestation or making speeches at COP summits,” said Unterstell, referring to the annual U.N. climate conference, which Brazil hosted last year. “It is also about how the state plans, operates and corrects infrastructure in an era of climate change.”

The Brazilian Institute of Environment and Renewable Natural Resources said in a statement the new legislation will potentially impact environmental protection and legal certainty.

Resistance to the dam built up over decades

The Juruna, are one of the more than two dozen Indigenous and traditional communities living along a 130-kilometer (80-mile) stretch of the Xingu River affected by the dam. They tie their existence to the river, which they regard as a family member, a connection so deep that they commonly say they “have canoes instead of feet.”

To operate, Belo Monte diverts 70% to 80% of the river’s flow. When the plant began operating in 2016, Juruna leaders say it marked “the end of the world.” Fish died in large numbers, navigation became nearly impossible and access to neighboring communities, schools and health care was severely restricted. Their diet shifted from fish to processed food.

“The impact was huge — environmental, social, cultural. And psychological, too. Some people, like my father, suffered deeply in ways I had never seen before,” said Josiel Jacinto Pereira Juruna, a 33-year-old Indigenous leader.

Indigenous and riverine communities had long warned that diverting water would collapse interconnected river systems.

In 2013, before the river was dammed, the Juruna people began organizing to monitor anticipated impacts.

The Indigenous monitoring group, known as MATI, later partnered with scientists from two Brazilian universities and Brazil’s National Institute for Amazonian Research. They collected evidence that helped prosecutors build a case showing Belo Monte’s impacts were far greater than Norte Energia had acknowledged.

Monitoring is carried out daily by Indigenous and riverine residents, who track water levels, groundwater, fish spawning areas and catches using mobile apps and field notebooks. The data is later digitized and jointly analyzed with researchers.

Josiel Juruna said the ruling brought a sense of validation. “We have to fight so much, prove so much. There is so much evidence, so many things happening, but at the same time nothing changes,” he said.

The dispute remains unsettled

Recent studies show that because of the Xingu River’s characteristics and intensifying droughts, the plant rarely operates at full capacity. Norte Energia has said that revising water diversion, as ordered by the court, could increase electricity prices and force greater reliance on thermal power plants, leading to higher carbon emissions.

Raimundo da Cruz Silva, a fisherman who turned to a struggling cocoa farming after Belo Monte, lives in the world’s largest rainforest and river basin — yet he struggles with a water crisis.

“Today, the territory is completely lacking potable drinking water,” he said.

Wells that once reached water at two to three meters (6.5 to 10 feet) now must be dug as deep as 15 meters (49 feet), and even then “some still produce nothing.”

Araújo, from Climate Observatory, said shutting down Belo Monte is not under discussion, but that a future renewal of its operating license should depend on measures to reduce impacts to people and the environment.

“Brazil’s history with hydropower must be a learning process,” she said. “We can’t accept that social and environmental impacts are ignored. They must be assessed with the highest level of rigor.”

___

The Associated Press’ climate and environmental coverage receives financial support from multiple private foundations. AP is solely responsible for all content. Find AP’s standards for working with philanthropies, a list of supporters and funded coverage areas at AP.org.

Copyright
© 2026 The Associated Press. All rights reserved. This material may not be published, broadcast, written or redistributed.



Source link

Amazon Brazils Dam hydropower Legal questions raise reliance setbacks
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleThe Sundance Film Festival is now streaming. Here’s how, and what, to watch
Next Article How Much Muscle Can You Gain In A Month? It’s Probably More Than You Think.

Related Posts

‘Melania,’ panned by some film critics, opens with strong ticket sales for a documentary

02/02/2026

What to know about Groundhog Day’s traditions and Punxsutawney Phil

02/02/2026

From southern India to Canada’s far north: New archbishop serves Indigenous Catholics

02/02/2026
Latest Posts

Denise Austin Demonstrates 3 ‘Simple and Effective’ Exercises to ‘Tone’ Arms Over 50

02/03/2026

Build balance and core strength with this standing abs workout for seniors and beginners

02/02/2026

≡ 11 Richest Female Rappers To Ever Live 》 Helitra.com

02/02/2026

If you work at a desk, a Pilates teacher recommends these three yoga strap moves to loosen up hunched shoulders

02/02/2026

I’ve replaced evening strolls with home walking workouts to keep active in winter—and these are my favourites

02/02/2026
Highlights

Denise Austin Demonstrates 3 ‘Simple and Effective’ Exercises to ‘Tone’ Arms Over 50

02/03/2026

Denise Austin shared three moves to strengthen arms.They can be done in just a few…

Build balance and core strength with this standing abs workout for seniors and beginners

02/02/2026

≡ 11 Richest Female Rappers To Ever Live 》 Helitra.com

02/02/2026

If you work at a desk, a Pilates teacher recommends these three yoga strap moves to loosen up hunched shoulders

02/02/2026
Architectural Concept
  • Architecture Concept
  • Interior Design
  • Landscape Design
  • Italy Highlights
  • Italy Attractions
  • Travel to Italy
  • Italy Food
  • Trip Ideas in Italy
  • Real Estate in Italy
  • Crypto News
  • Finances News
  • Investing News
  • Economic News
Marketing News
  • Marketing News
  • Digital Marketing News
  • Brand Strategy
  • Seo News
  • Finances News
  • Investing News
  • Crypto News
  • Cho thuê căn hộ
  • Hỗ trợ mua nhà
  • Tư vấn mua nhà
  • Tiến độ dự án
  • Tàng thư các
  • Truyện tranh Online
  • Truyện Online
Rental Car
  • Xe Rental
  • Car Rental
  • Rental Car
  • Asia Pacific Lighting
  • Indoor Lighting
  • Outdoor Lighting
  • Solar Light
  • Vi Vu Tây Nguyên
  • Đi chơi Tây Nguyên
  • Khách sạn Tây Nguyên
  • Tour du lịch Tây Nguyên
  • Cho thuê xe Miền Tây
Copyright © 2023. Designed by Helitra.com.
  • Home
  • Entertainment
  • Healthcare
  • Lifestyle
  • Living
  • Style & Beauty
  • Travel

Type above and press Enter to search. Press Esc to cancel.

Go to mobile version